32
FINISH
Your gable units are now installed.
1-1/2"
(3,8 cm )
Measure and
Mark
NAIL FIRST
1-1/2"
(3,8 cm)
6"
(15,2 cm)
GABLE UNIT INSTALLATION
Pre-assembled
PARTS REQUIRED:
2" (5,1 cm)
x90
x8
3" (7,6 cm)
x2
BEGIN
Continue nailing lower edge of panels into top plate doublers with 1-1/2" nails spaced 6" apart.
Working inside, secure gable unit with (2) 3" screws toe-screwed into each
AF
at an angle
(Fig. A)
.
2
Lift and set gable unit on wall doubler.
Measure 1-1/2" (3,8 cm) down from top plate doubler and mark at each side as shown.
Hold secure with (1) 1-1/2" nail on each side.
1
ENSURE GABLE IS CENTERED ON WALL BEFORE NAILING.
AF
NAIL FIRST
1-1/2"
(3,8 cm)
DOUBLER
2-9/16"
(6,5 cm )
Measure and
Mark
Fig. A
DOUBLER
3" (7,6 cm)
Screws
3
Secure panels to rafter with 1-1/2" nails spaced 6" apart.
Repeat steps to install gable unit on the opposite side.