
57
FINISH
4
5
3
From inside of the shed, secure shutter at
locations indicated with "
X
" using 3/4" screws.
Have a second person hold and press inward
from outside shed while screws are installed.
Install
DT
fl ush to bottom of shutters.
Align
DT
fl ush with shutter slats
(Fig. C)
.
Secure with 2" fi nish nails.
Nail into wall frame and studs behind.
Your window and shutters are now installed.
Fig. B
Fig. C
2" (5,1 cm)
Finishing Nails
3/4"
(19 mm)
Screws
from inside
Flush
Flush
LEVEL
Line-up shutter slat fl ush with end corner of
DT
as shown
(Fig. B)
.
Use a level to ensure shutter is level.
Secure with 2" fi nishing nails at locations shown.
Nail into wall studs.
Don't nail into metal window frame.
PUSH IN T
O STEADY
PANEL
DT
DT
Flush
Flush
SHUTTERS
2"
(5,1 cm)
Finishing Nails