7 Cleaning and servicing the heating system – Requirements
85
C
HECKING
AND
EMPTYING
THE
ASH
PAN
(
MANUAL
ASH
REMOVAL
)
1.
Switch the heating system off.
✎
See the “HDG Control” operating manual, chapter “5 Using the
control unit”, section “5.3 Switching off the heating system”.
2.
Allow the fire in the heating system to burn out and cool down.
3.
Turn the main switch off.
4.
Unscrew the star-grip screws (1) and open the ash doors.
5.
Pull out the ash pan (3).
6.
Empty the ash into a fireproof container.
7.
Reinsert the ash pan (3) and lock the ash doors (2) in the reverse
sequence.
8.
Re-starting the heating system.
✎
See the “HDG Control” operating manual, chapter “5 Using the
control unit”, section “5.2 Switching on the heating system”.
✓
The ash pans have been checked and emptied.
C
HECKING
AND
EMPTYING
ASH
CONTAINERS
(
AUTOMATIC
ASH
REMOVAL
)
1.
Switch the heating system off.
✓
See the “HDG Control” operating manual, chapter “5 Using the
control unit”, section “5.3 Switching off the heating system”.
2.
Allow the fire in the heating system to burn out and cool down.
3.
Turn the main switch off.
Figure 7/5 - Check the ash pan and empty.
3
2
1
Important!
✎
Observe the “Generally applicable safety instructions” in this sec-
tion.
Caution!
Danger of fire from combustion residues
Hot combustion residues can lead to a fire.
Allow the ash to cool and place it only in a suitable fireproof con-
tainer.