3
USE ONLY HAYWARD GENUINE REPLACEMENT PARTS
Flush Mount Installation (without optional Mud Box)
Flush mounting the AQL-SS-6B/D is similar to surface mounting except that the flush mount
frame is used and a cutout is made to accommodate the body. The remote (with frame) is
inserted into the cutout and the O-ring is inserted into the PVC pipe. Refer to the diagram below
and follow the following steps:
1. Find the desired location for the installation of the AQL-SS-6B/D and cut out the hole using
one of the included templates (page 10). The remote should be mounted in a location above
the high water mark.
2. Install a 6” (minimum) piece of 1”, 1¼”, or 1½” PVC pipe to be used as a receptacle for
the AQL-SS-6B/D. The pipe will be installed in the pool/spa wall, centered on the cutout
with the pipe end located ¾” behind the cutout surface. The other end should be attached
to ½” or ¾” electrical conduit and run back to the Pro Logic/Aqua Logic. See below. It is
advisable that this pipe be plumbed as level as possible although the O-ring is designed to
compensate for small variations from perpendicular if necessary.
3. Run the cable from the AQL-SS-6B/D through the conduit to the Pro Logic/Aqua Logic.
4. Run a small bead of silicone sealant along the outside edge of the frame. Attach the remote
to the mounting surface by sliding the O-ring into the pipe and pushing the frame against
the surface. NOTE: Do NOT apply sealant to the compression O-ring or PVC pipe.
1, 1¼, or 1½ in. PVC
Conduit
½ or ¾ in. PVC
Conduit
1, 1¼, or
1½ in. O-ring
Apply Silcone Sealant
along outside edge only
Cutout for flush mounting
Mounting surface
¾”
To Aqua Logic
To Aqua Logic
2”
minimum
Coping line