Nozzle Body and Nozzle Control Valve Installation: Boom Cable Routing and Connection
23
NOZZLE BODY AND NOZZLE CONTROL VALVE INSTALLATION
7. Be sure the corrosion inhibitor has coated the NCV contacts and recessed portions of the connector.
NOTE:
To determine if corrosion inhibitor has been applied, inspect for a thick liquid in the bottom of the
connector.
8. Once all boom cables are routed along the boom as desired, begin connecting the boom cables to the
Hawkeye® 2 NCVs previously installed.
9. Use provided cable ties to secure the boom cables to the boom components as needed to ensure they are
secure.
NOTE:
Do not put strain on cables and connections while applying tie-downs.
Do not leave any exposed cable loops that may get caught on crops or other debris while the vehicle
is in use.
Allow enough cable slack for the boom to fully fold and unfold without stretching the harness or
catching on the boom.
10. The inner boom cables will be connected to the RCM TO LEFT/RIGHT chassis cable in a later section.
Summary of Contents for AGCO RoGator A Series
Page 8: ...CHAPTER 1 4 Hawkeye 2 Installation Manual for AGCO RoGator A B Series RG900 RG1100 RG1300...
Page 18: ...CHAPTER 2 14 Hawkeye 2 Installation Manual for AGCO RoGator A B Series RG900 RG1100 RG1300...
Page 20: ...CHAPTER 3 16 Hawkeye 2 Installation Manual for AGCO RoGator A B Series RG900 RG1100 RG1300...
Page 28: ...CHAPTER 4 24 Hawkeye 2 Installation Manual for AGCO RoGator A B Series RG900 RG1100 RG1300...
Page 52: ...CHAPTER B 48 Hawkeye 2 Installation Manual for AGCO RoGator A B Series RG900 RG1100 RG1300...