5
Assembly and installation
5.1 Mechanical connection
Assembly
Setting up and attaching
1. Check the order coding to identify the intended mounting position.
■
Vertical (type:
KA...S...
) or
■
Horizontal (type:
KA...L...)
2. Check that the support/frame possesses sufcient load capacity. This depends on the hydraulic power
pack’s weight.
3. Drill fastening holes as instructed by the mounting hole pattern.
4. Bolt into the M8 threaded holes using the recommended damping elements.
■
The horizontal version can also be incorporated vertically.
■
If you are installing a horizontal version vertically:
– Position with bleeder at top.
– Position the integrated pump at the bottom.
– Turn only the top housing covers, keep the extensions in their original positions.
Mounting hole pattern
Horizontal version coding
L
Vertical version coding
S
Coding tank size
a
--
284
01, 1
336
02, 2
484
22, 3
684
Recommended fastening
with damping element
1
Damping element
#
40x30/M8 (65 Shore)
20/61
B 8010 - 04-2021 - 1.0
HAWE Hydraulik SE