71
4000392150
E02.16 USA
/
GB
Lubrication-Tightening-Clearance check
Slew ring
E005
15 mn
5 - Criteria of replacement
Check the slewing system every 500 h or each major intervention done on the machine.
Step 1 : Visual and sound check :
Replace slew ring in the following cases :
• Abnormal noise during the turntable rotation.
• Movement jolts during the rotation of the turret.
• Gear teeth missing or damaged.
• Presence of metal particles in the grease.
• Wear on gear teeth.
Step 2 : Measurement of the clearance :
Place the machine in the following conditions :
• On flat ground, Set up barriers to define the test area.
• No load in the platform.
• From the ground control box, align the turret at 90 ° to the chassis.
• Lift the boom approximatively 30 ° from the ground.
• Completely retract the boom.
• Jib in horizontal position(if fitted).
From the magnetic comparator, note the clearance ( J1) between chassis (or turret) and the slew ring.
Clearance between chassis (or turret) and slew ring
After having carried out the measurement :
• Lower the boom at horizontal position.
• Lift the arm (if exists) as its maximum position. Don’t extend the telescopic boom.
• The telescopic boom should be fully extended and in the horizontal position..
• Jib in horizontal position(if fitted).
In its new configuration, note the clearance ( J1) between chassis (or turret) and the slew ring as
previously.
• If the difference between two measurements does not exceed 2 mm : the test validates correct operation.
• Otherwise, contact HAULOTTE Services® to repair the system.
J1
Summary of Contents for HA100RTJ PRO
Page 2: ...2 4000392150 E02 16 USA GB HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO...
Page 64: ...64 4000392150 E02 16 USA GB Control Oil change Wheel reducer E002 15 mn Notes...
Page 66: ...66 4000392150 E02 16 USA GB Replacement Hydraulic filter cartridge E003 15 min Notes...
Page 68: ...68 4000392150 E02 16 USA GB Filling up Oil change Fuel tank E004 15 mn Notes...
Page 76: ...76 4000392150 E02 16 USA GB Replacement Tightening Wheel E006 15 min Notes...
Page 78: ...78 4000392150 E02 16 USA GB Tightening Screws bolts and nuts E007 15 min Notes...
Page 80: ...80 4000392150 E02 16 USA GB Control Oil change Turntable rotation gearbox E008 15 mn Notes...
Page 86: ...86 4000392150 E02 16 USA GB Control Lubrication Chains E016 Notes...
Page 94: ...94 4000392150 E02 16 USA GB Control Filling up Battery charge Battery E018 10 min Notes...
Page 96: ...96 4000392150 E02 16 USA GB Lubrication Telescope E022 15 mn Notes...
Page 140: ...2 Electrical diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO 1 2 ENGINE PART II...
Page 141: ...3 Electrical diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO 1 3 TURRET PART...
Page 142: ...4 Electrical diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO...
Page 143: ...5 Electrical diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO...
Page 144: ...6 Electrical diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO...
Page 145: ...7 Electrical diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO 1 4 CHASSIS PART...
Page 146: ...8 Electrical diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO 1 5 BASKET PART...
Page 147: ...9 Electrical diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO...
Page 149: ...11 Electrical diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO 1 7 NEW ARCHITECTURE...
Page 150: ...12 Electrical diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO 1 8 MINIDAT...
Page 152: ...2 Hydraullic diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO 1 2 FOLIO 2 3...
Page 153: ...3 Hydraullic diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO 1 3 FOLIO 3 3...
Page 155: ...5 Hydraullic diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO 2 2 FOLIO 2 3...
Page 156: ...6 Hydraullic diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO 2 3 FOLIO 3 3...