A
B
C
D
E
F
G
H
I
57
4000392150 E02.16
USA
/
GB
HA32RTJ PRO - HA100RTJ PRO - HA41RTJ PRO - HA130RTJ PRO
C
- Maintenance
7.3.2.3 - Bearings
Action on bearings needs to be taken outside the normal maintenance schedule if the following
occurs :
• Abnormal noise during the movements of the structure.
• Machine not use for a period of 6 months or more.
• Environment of storage and specific uses(Strong moisture and salinity of the air).
Checking procedure :
• After disassembling the affected pivot, protect the bearing from external pollutants and potential
damage.
• Clean the bearing with a suitable solvent.
• Replace the bearing in the following cases :
• Presence of abrasions in the bearing housing and/or inside the bearing itself.
• Presence of abrasion, wear, oxidation, deformations of the balls (or rollers) and the ring rollers.
• Reassembly of the bearing/pivot :
• Clean the bearing housing or pin in order to remove all the foreign objects/abrasions.
• Lightly lubricate the bearing housing and/or pin.
• Lightly lubricate the outer ring of the bearing.
• Fit a bearing in a boring, take support on the external ring of the bearing.
• Fit a bearing on a pin, take support on the interior ring of the bearing.
7.3.2.4 - Brakes
The brake system is an important component of the safety of the machine. It is essential to
carry out functional tests periodically (every 6 month).
First test : High speed :
• This test must be completed on flat ground or on ground that has a incline(less than that for which the
machine is rated. Refer to the manufacturers ID plate on the machine to determine the maximum
incline).
• Draw a line on the ground to create a stopping reference.
• Drive forward until the maximum speed is reached (Between 3 km/h (1,9 mph) or 6 km/h (3,7 mph)
depending on the machine being tested(Check the specification in the Operation Manual)).
• Release the joystick when the front wheels make contact with the stopping line previously drawn.
• When the machine comes to a stop, measure the distance between the middle of the front wheels and
the reference mark on the ground :
• If the distance is between 0,2 m(0 ft8 in) and 1,5 m(4 ft11 in), the test validates correct operation.
• Otherwise, contact HAULOTTE Services® to repair the system.
For safety reasons, rensure that the following precautions are taken prior to testing commencing :
• Set up barriers to define the test area.
• Place the machine in transport position(Jib in horizontal position accepted)
• Wearing of a safety harness is essential.
Summary of Contents for HA100RTJ PRO
Page 2: ...2 4000392150 E02 16 USA GB HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO...
Page 64: ...64 4000392150 E02 16 USA GB Control Oil change Wheel reducer E002 15 mn Notes...
Page 66: ...66 4000392150 E02 16 USA GB Replacement Hydraulic filter cartridge E003 15 min Notes...
Page 68: ...68 4000392150 E02 16 USA GB Filling up Oil change Fuel tank E004 15 mn Notes...
Page 76: ...76 4000392150 E02 16 USA GB Replacement Tightening Wheel E006 15 min Notes...
Page 78: ...78 4000392150 E02 16 USA GB Tightening Screws bolts and nuts E007 15 min Notes...
Page 80: ...80 4000392150 E02 16 USA GB Control Oil change Turntable rotation gearbox E008 15 mn Notes...
Page 86: ...86 4000392150 E02 16 USA GB Control Lubrication Chains E016 Notes...
Page 94: ...94 4000392150 E02 16 USA GB Control Filling up Battery charge Battery E018 10 min Notes...
Page 96: ...96 4000392150 E02 16 USA GB Lubrication Telescope E022 15 mn Notes...
Page 140: ...2 Electrical diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO 1 2 ENGINE PART II...
Page 141: ...3 Electrical diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO 1 3 TURRET PART...
Page 142: ...4 Electrical diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO...
Page 143: ...5 Electrical diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO...
Page 144: ...6 Electrical diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO...
Page 145: ...7 Electrical diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO 1 4 CHASSIS PART...
Page 146: ...8 Electrical diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO 1 5 BASKET PART...
Page 147: ...9 Electrical diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO...
Page 149: ...11 Electrical diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO 1 7 NEW ARCHITECTURE...
Page 150: ...12 Electrical diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO 1 8 MINIDAT...
Page 152: ...2 Hydraullic diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO 1 2 FOLIO 2 3...
Page 153: ...3 Hydraullic diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO 1 3 FOLIO 3 3...
Page 155: ...5 Hydraullic diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO 2 2 FOLIO 2 3...
Page 156: ...6 Hydraullic diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO 2 3 FOLIO 3 3...