12
4000392150
E02.16
USA / GB
HA32RTJ PRO - HA100RTJ PRO - HA41RTJ PRO - HA130RTJ PRO
A
- Safety precautions
3 - Scope of intervention
The inspection and maintenance table below, identifies the role and the responsibilities of each party
in periodical machine maintenance..
Inspections and maintenance
If the machine is operated in a hostile environment or intensively, increase the frequency of maintenance.
Type of intervention
Frequency
Person-in-charge
Intervenor
Reference document
Pre-delivery inspection
Before each delivery of
sold, hired or resold
equipment
Owner (or hirer)
Qualified HAULOTTE Services®
technician
Operator's manual
Pre-operation
inspection
Before operation or
when the operator
changes
Operator
Operator
Operator's manual
Periodical preventive
maintenance
At the specified
intervals (250 hours
or 1 year)
Owner (or hirer)
On-site technician or qualified
HAULOTTE Services® technician
Maintenance book
Periodical visit
2 times a year or at the
latest 6 months after
the last periodic visit,
and according to the
local regulations
Owner (or hirer)
Organization or technician
approved by the employer or by
the intermediary of
HAULOTTE Services® in
accordance with the
HAULOTTE Services® contract
Maintenance book
Summary of Contents for HA100RTJ PRO
Page 2: ...2 4000392150 E02 16 USA GB HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO...
Page 64: ...64 4000392150 E02 16 USA GB Control Oil change Wheel reducer E002 15 mn Notes...
Page 66: ...66 4000392150 E02 16 USA GB Replacement Hydraulic filter cartridge E003 15 min Notes...
Page 68: ...68 4000392150 E02 16 USA GB Filling up Oil change Fuel tank E004 15 mn Notes...
Page 76: ...76 4000392150 E02 16 USA GB Replacement Tightening Wheel E006 15 min Notes...
Page 78: ...78 4000392150 E02 16 USA GB Tightening Screws bolts and nuts E007 15 min Notes...
Page 80: ...80 4000392150 E02 16 USA GB Control Oil change Turntable rotation gearbox E008 15 mn Notes...
Page 86: ...86 4000392150 E02 16 USA GB Control Lubrication Chains E016 Notes...
Page 94: ...94 4000392150 E02 16 USA GB Control Filling up Battery charge Battery E018 10 min Notes...
Page 96: ...96 4000392150 E02 16 USA GB Lubrication Telescope E022 15 mn Notes...
Page 140: ...2 Electrical diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO 1 2 ENGINE PART II...
Page 141: ...3 Electrical diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO 1 3 TURRET PART...
Page 142: ...4 Electrical diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO...
Page 143: ...5 Electrical diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO...
Page 144: ...6 Electrical diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO...
Page 145: ...7 Electrical diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO 1 4 CHASSIS PART...
Page 146: ...8 Electrical diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO 1 5 BASKET PART...
Page 147: ...9 Electrical diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO...
Page 149: ...11 Electrical diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO 1 7 NEW ARCHITECTURE...
Page 150: ...12 Electrical diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO 1 8 MINIDAT...
Page 152: ...2 Hydraullic diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO 1 2 FOLIO 2 3...
Page 153: ...3 Hydraullic diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO 1 3 FOLIO 3 3...
Page 155: ...5 Hydraullic diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO 2 2 FOLIO 2 3...
Page 156: ...6 Hydraullic diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO 2 3 FOLIO 3 3...