A
B
C
D
E
F
G
H
I
51
4000392150 E02.16
USA
/
GB
HA32RTJ PRO - HA100RTJ PRO - HA41RTJ PRO - HA130RTJ PRO
C
- Maintenance
6 - Major inspection
Major inspection allow determining the suitability, integrity and proper functioning of the machine : It
must take place when the machine is 10 years or 5000 h after renewed every 5 years.
This inspection is the responsibility of the owner, and it must be conducted by a HAULOTTE Services®
technician.
This inspection includes the daily, periodic and reinforced inspections. Refer to the Operators manual
for further information.
Major inspection
In addition with daily, periodic,
and reinforced inspections
Visual inspection with small disassembly or
movement needed to reach the part.
Replacement is necessary.
Systematic replacement
Proof tests. Need HAULOTTE Services® authorization. For countries where machines are not subject to
controlled periodic maintenance.
Yes
No
Corrected
Not applicable
Frame, axle, steering system, stabilizers arms ...
No deterioration and visible damage
Pin, pin stop, bearing ...
Bushes and bearing replacement realized
Pulleys, chains and wire rope
Chains and wire rope replacement realized
Wear pads and devices of guidance
Wear pads replacement realized
Cylinder and hydraulic component : pump, filters, manifold
Adjusting the hydraulic pressure realized
Additional inspection
Daily inspection checked
Periodic inspection checked
Maintenance program realized
Summary of Contents for HA100RTJ PRO
Page 2: ...2 4000392150 E02 16 USA GB HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO...
Page 64: ...64 4000392150 E02 16 USA GB Control Oil change Wheel reducer E002 15 mn Notes...
Page 66: ...66 4000392150 E02 16 USA GB Replacement Hydraulic filter cartridge E003 15 min Notes...
Page 68: ...68 4000392150 E02 16 USA GB Filling up Oil change Fuel tank E004 15 mn Notes...
Page 76: ...76 4000392150 E02 16 USA GB Replacement Tightening Wheel E006 15 min Notes...
Page 78: ...78 4000392150 E02 16 USA GB Tightening Screws bolts and nuts E007 15 min Notes...
Page 80: ...80 4000392150 E02 16 USA GB Control Oil change Turntable rotation gearbox E008 15 mn Notes...
Page 86: ...86 4000392150 E02 16 USA GB Control Lubrication Chains E016 Notes...
Page 94: ...94 4000392150 E02 16 USA GB Control Filling up Battery charge Battery E018 10 min Notes...
Page 96: ...96 4000392150 E02 16 USA GB Lubrication Telescope E022 15 mn Notes...
Page 140: ...2 Electrical diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO 1 2 ENGINE PART II...
Page 141: ...3 Electrical diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO 1 3 TURRET PART...
Page 142: ...4 Electrical diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO...
Page 143: ...5 Electrical diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO...
Page 144: ...6 Electrical diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO...
Page 145: ...7 Electrical diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO 1 4 CHASSIS PART...
Page 146: ...8 Electrical diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO 1 5 BASKET PART...
Page 147: ...9 Electrical diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO...
Page 149: ...11 Electrical diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO 1 7 NEW ARCHITECTURE...
Page 150: ...12 Electrical diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO 1 8 MINIDAT...
Page 152: ...2 Hydraullic diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO 1 2 FOLIO 2 3...
Page 153: ...3 Hydraullic diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO 1 3 FOLIO 3 3...
Page 155: ...5 Hydraullic diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO 2 2 FOLIO 2 3...
Page 156: ...6 Hydraullic diagram HA32RTJ PRO HA100RTJ PRO HA41RTJ PRO HA130RTJ PRO 2 3 FOLIO 3 3...