46
Warning
Shock Hazard. Make sure unit is
disconnected from power source.
M
AINTENANCE
AND
S
ERVICING
Check Valve
If the unit does not maintain pressure during operation, the
check valve may not be seated properly. To reseat the
check Valve:
1.
Run the unit in Purge for one minute to loosen
the check valve ball.
2.
Run a test cycle. It should reseat the check valve
ball.
3.
If the check valve continues to leak under
pressure, replace it (see Figure 12).
Electrical Components
Fuses
If the control panel does not activate when Power Switch is
ON, check the fuse cartridges. If a fuse is blown, replace it
with another of the same rating.
Model
Fuse
Code
Part No.
EC5500
100V, 12A, Time Lag
T
5120-0036
115V, 10A, Time Lag
T
261575
230V, 7A, Time Lag
T
440-0020
EC6000
115V, 15A, Time Lag
T
264305
110V, 15A, Time Lag
T
264305
230V, 8A, Time Lag
T
FZX67
Fuse Replacement
1.
Disconnect unit from power supply.
2.
Remove unit cover.
3.
Remove the fuse.
4.
Check the fuse with an ohmmeter. Replace fuse
if necessary.
5.
Reinstall fuse.
6.
Replace the unit cover.
7.
Reconnect unit to power supply.
Summary of Contents for Chemiclave EC5500
Page 15: ...15 Figure 4 Metering Valve Function PRINCIPLES OF OPERATION ...
Page 16: ...16 Figure 7 Pressurization PRINCIPLES OF OPERATION Figure 6 Ready Load Figure 5 Warm Up ...
Page 17: ...17 Figure 8 EC5500 EC6000 Operation PRINCIPLES OF OPERATION ...
Page 18: ...18 Figure 11 End Unload Figure 10 Purge Figure 9 Exposure PRINCIPLES OF OPERATION ...
Page 20: ...20 Figure 13 Piping Schematic PRINCIPLES OF OPERATION ...
Page 21: ...21 Figure 14 Cycle Phase Diagram PRINCIPLES OF OPERATION ...
Page 22: ...22 Door Gasket Figure 15 Exploded View Top Cover and Door PRINCIPLES OF OPERATION ...
Page 32: ...32 MAINTENANCE AND SERVICING Figure 17 Metering Valve need new drawing ...
Page 39: ...39 MAINTENANCE AND SERVICING Figure 22 Power Supply Printed Circuit Board ...
Page 56: ...56 ...