
19
Figure 12: Component Locations
P
RINCIPLES
OF
O
PERATION
Check
Valve
Condenser
Heater Leads
(2 - 230V/100V,
3-115V)
Display
control
board Control
Knob
Pressure
Gauge
Power
Supply
Board
MV Bracket
Thermostat
See Det. “B”
Metering
Valve (MV)
MV to
condenser
Spill
Shield
Valve Shaft
Switch
Valve Shaft
Power
Switch
Detail “B”
(EC5500 models)
Heater
Thermostat
Detail “B”
(EC6000 models)
Thermostat
Summary of Contents for Chemiclave EC5500
Page 15: ...15 Figure 4 Metering Valve Function PRINCIPLES OF OPERATION ...
Page 16: ...16 Figure 7 Pressurization PRINCIPLES OF OPERATION Figure 6 Ready Load Figure 5 Warm Up ...
Page 17: ...17 Figure 8 EC5500 EC6000 Operation PRINCIPLES OF OPERATION ...
Page 18: ...18 Figure 11 End Unload Figure 10 Purge Figure 9 Exposure PRINCIPLES OF OPERATION ...
Page 20: ...20 Figure 13 Piping Schematic PRINCIPLES OF OPERATION ...
Page 21: ...21 Figure 14 Cycle Phase Diagram PRINCIPLES OF OPERATION ...
Page 22: ...22 Door Gasket Figure 15 Exploded View Top Cover and Door PRINCIPLES OF OPERATION ...
Page 32: ...32 MAINTENANCE AND SERVICING Figure 17 Metering Valve need new drawing ...
Page 39: ...39 MAINTENANCE AND SERVICING Figure 22 Power Supply Printed Circuit Board ...
Page 56: ...56 ...