8
Installation of Star Wheel and Bale Rate Harness
First, remove the cover from the star wheel block and use a 1/4” nut driver to remove the nut from the
electronic swivel. Next, run the star wheel sensor wire through the black grommet and place the eye terminal
on the star wheel sensor. Tighten the eye loop with the nut on the sensor and put the star wheel cover back on
the base. Next, tighten the grommet to form a tight seal around the wire. The bale rate sensors will be factory
installed on the right side twine guard in the correct position. The sensor with the longer sensor wire should say
“FRONT”, which indicates it should be placed in the front sensor hole. The sensor wire with the shorter wire
should say “BACK.” The tip of the sensor should be placed no more than 1/4” (7mm) away from the star wheel
te
eth and no less than 1/8” (3mm) from the star wheel teeth. Each sensor will have an LED light located on the
sensor by the diverter. Once the unit is powered up spin the wheel and make sure that both led lights turn on
and off. If they don’t turn on and off, adjustments may need to be made.
Main Wire Harness and Baler Interface Harness Routing and Connections
Installation of Bluetooth Receiver
Locate a safe location in the cab of the tractor to place the Bluetooth
Receiver (030-6672B). Recommended location is as close to the iPad
being used as possible.
Connect the Power / Communication harness (006-6650TM(E)) to the
bottom of the receiver (right).
*New for production year 2018. All Bluetooth receivers (030-6672B) are
now equipped with lights to indicated both power and iPad connection.
Red Light
– The Bluetooth receiver has power
Green Light
– When the proper active connection is selected in the Hay App menu, the green light will indicate
connection with the iPad.
A. Route harness 006-6650LS2 along this path or similar inside of the
baler. Keep harnesses away from moving parts and hydraulic hoses.
Secure with existing cable clamps or use cable ties. When all connections
are made to the DCP secure wires as shown above to allow for water to be
shed away from the DCP.
B. Under the chamber locate the Active Terminator from the end of the
baler harness. It is located at the right rear corner of the baler frame. Attach
Baler Interface Harness (006-6650VA) to that location. Reconnect Active
Terminator to open port of that same harness (006-6650VA). If your baler
does not have a Terminator at this location please call Harvest Tec.
If your baler has the White Terminating Resistor you will need to attach the
Pre 2012 AGCO Integration Harness (006-6650VAX) to the end of the Baler
Interface harness (006-6650VA). Please contact Harvest Tec for this
harness.
This style terminator may be next to the Baler’s Main Processor.
Summary of Contents for 602A
Page 22: ...22 Notes...