10: W
ith the aid of a second
person lift the side frame up and
place into the connecting arms
A n d
b o l t
t o g e t h e r
u s i n g
BOL121, BOL710 & BOL102.
BOL121, BOL710
BOL710, BOL102
BOL102, BOL710
BOL102
SEP497,BOL710,
BOL102
11: D
o the same for the other
hand.
PAGE 7
ASSEMBLY & MAINTENANCE INSTRUCTIONS
BOL334 X3
PEQ093 & PEQ094
X1
COMPRESS THE
SPRING OF BOL228
AND SLIDE INTO THE
CHANNEL X4
BOL331
X1
12:
C
onnect the crossbar (FEP082) & upright (FEP170) together
. Slide BOL204 into
the channel as shown below. Then place PEQ093 or PEQ094 into the channel depending
on which hand you are doing as shown, then bolt together using BOL334 and BOL331
(note BOL331 needs only to be loosely tightened).
Do the same for both sides of the crossbar.
(
Y
.
NOTE:
ou might have
To sightly adjust the
Arms to suit your
Playing surface)
PEQ980 IS TO LOCK THE GOAL
INTO PLACE WHILST THE GOAL
IS FULLY OPEN IN USE OR WHILE
THE IS FOLDED AGAINST THE
WALL.
ATTACH HKS012 & BOL825 TO
THE EYES, USE PLIERS TO SECURE
TIGHTLY.
SEP497,BOL710,
BOL102