background image

N2FB / N236FB / N366FB / N68FB / N810FB

3-Point Stationary Backstop System

Installation and Maintenance Manual

Call Jaypro Sports at 1-800-243-0533 during

regular business hours for technical support.

www.jaypro.com

Summary of Contents for N2FB

Page 1: ...FB N236FB N366FB N68FB N810FB 3 Point Stationary Backstop System Installation and Maintenance Manual Call Jaypro Sports at 1 800 243 0533 during regular business hours for technical support www jaypro com ...

Page 2: ...return the equipment to the original level of safety 6 Follow all warning signs and labels on equipment 7 Inspect all equipment before each use 8 Should equipment become damaged immediately stop using the system and tape off the area around the equipment Do not continue using the equipment until a qualified service technician has inspected the equipment and certified the system is safe to resume u...

Page 3: ...be held liable should the wall anchors fail CHAIN SUPPORTS 1 The chain supports attach to the upper frame members It is not allowed to attach the chain to the lower frame member The location of the chain supports on the wall is dependent on the desired face of bank FOB Please note the chains supports must always be 45 degrees or greater 2 Verify the wall is of sufficient height to install the back...

Page 4: ...es are drilled as straight as possible otherwise it will become difficult to level the stringers during installation 5 Chain attachments if equipped are achieved using a 66 long stringer WH 35 The chain attachments see the majority of the loading for wall mounted units When anchoring the stringer to the wall 8 eight anchors are required per stringer 6 The lower frame attachment is achieved using a...

Page 5: ...ttaching the stringers Clean the area thoroughly before proceeding to prevent spreading masonry dust 3 IMPORTANT Determine the proper anchor for each location All wall anchors are the responsibility of the installer All wall anchors must be 1 2 hardware minimum A combination of different types of anchors may be necessary and is acceptable If conditions allow thru bolting is the preferred method of...

Page 6: ... SIDE BOARD SIDE 2 3 8 O D FRAME PIPE 1 90 O D FRAME PIPE DIM A FACE OF BANK DIM B LOWER 2 3 8 FRAME PIPE LENGTH DIM C UPPER 1 90 FRAME PIPE LENGTH 9 8 3 4 ABOVE FINISHED FLOOR DIM A FACE OF BANK DIM B in DIM C in 6 2 1 4 2 1 4 7 3 1 4 3 1 4 8 4 1 4 4 1 4 9 5 1 4 5 1 4 10 6 1 4 6 1 4 11 7 1 4 7 1 4 1 0 8 1 4 8 1 4 1 1 9 1 4 9 1 4 1 2 10 1 4 10 1 4 1 3 11 1 4 11 1 4 1 4 12 1 4 12 1 4 1 5 13 1 4 13 ...

Page 7: ...ion shown below BOARD SIDE BOARD SIDE 1 90 O D FRAME PIPE 2 3 8 O D FRAME PIPE DIM A FACE OF BANK 10 0 ABOVE FINISHED FLOOR 9 8 3 4 ABOVE FINISHED FLOOR 1 8 DIM B LOWER 2 3 8 FRAME PIPE LENGTH DIM C UPPER 1 90 FRAME PIPE LENGTH 2 3 DIM B 1 3 DIM B 1 3 DIM C 2 3 DIM C DIM A FACE OF BANK DIM B in DIM C in 2 0 20 1 4 20 1 4 2 1 21 1 4 21 1 4 2 2 22 1 4 22 1 4 2 3 23 1 4 23 1 4 2 4 24 1 4 24 1 4 2 5 2...

Page 8: ...that must be installed in the orientations shown below 1 90 O D FRAME PIPE 9 16 DRILLED IN FIELD FACTORY DRILLED ONE END ONLY DIM B FRAME PIPE LENGTH 1 1 CENTER ALL BRACING ON FRAME ASSEMBLY 45 DIM A FACE OF BANK DIM B FRAME PIPE LENGTH 9 9 ABOVE FINISHED FLOOR 1 9 DIM C 10 0 AFF EQUAL EQUAL DIM A FACE OF BANK DIM B in DIM C in 3 6 36 1 8 35 3 7 37 1 8 36 3 8 38 1 8 37 3 9 39 1 8 38 3 10 40 1 8 39...

Page 9: ...cross bracing on the top frame members that must be installed in the orientations shown below 1 90 O D FRAME PIPE 9 16 DRILLED IN FIELD FACTORY DRILLED ONE END ONLY DIM B FRAME PIPE LENGTH 1 1 45 MIN DIM A FACE OF BANK DIM B FRAME PIPE LENGTH 9 9 ABOVE FINISHED FLOOR 1 9 DIM C DIM A FACE OF BANK DIM B in DIM C in 6 0 66 1 8 65 6 1 67 1 8 66 6 2 68 1 8 67 6 3 69 1 8 68 6 4 70 1 8 69 6 5 71 1 8 70 6...

Page 10: ...ng on the top frame members that must be installed in the orientations shown below 1 90 O D FRAME PIPE 9 16 DRILLED IN FIELD FACTORY DRILLED ONE END ONLY DIM B FRAME PIPE LENGTH 1 1 DIM A FACE OF BANK DIM B in DIM C in 8 0 90 1 8 89 8 1 91 1 8 90 8 2 92 1 8 91 8 3 93 1 8 92 8 4 94 1 8 93 8 5 95 1 8 94 8 6 96 1 8 95 8 7 97 1 8 96 8 8 98 1 8 97 8 9 99 1 8 98 8 10 100 1 8 99 8 11 101 1 8 100 9 0 102 ...

Page 11: ...racing that is required Ensure all BRC 190 A clamps are loosely slid onto the frame before attaching the horizontal frame pipes to the wall 5 As shown in Figure 3 attach the top frame to the wood stringer and support the frame with the support chain and turnbuckle Adjust the turnbuckles to level the frame structure and to evenly distribute the weight of the unit Next attach the lower frame to the ...

Page 12: ...ES IN DESIGN AND MANUFACTURING COPYRIGHT 2019 JAYPRO SPORTS LLC ALL RIGHTS RESERVED Sheet 12 of 18 INNOVATION PERFORMANCE AND COMMITMENT SINCE 1953 SYSTEM OVERVIEW BACKSTOPS WITHOUT CHAIN SUPPORT Unit shown is for 2 0 to 3 6 face of bank backstops The internal bracing may not be required for all units FRAME BRACING QTY DEPENDS ON FACE OF BANK 36 ALUMINUM FAN BACKBOARD BREAKAWAY GOAL GOAL HARDWARE ...

Page 13: ...ING REQUIRED N2FB N236FB ASSEMBLY DETAILS Refer to the proper table for the cut drill requirements for the proper face of bank For units requiring diagonal bracing make sure to slide on the brace clamp to frame piping before installing Bottom brace clamps must be secured with self taping screw provided HS286 HW334 HW2050 LOWER MOUNT LOWER FRAMING HS2129 HN268 HB5045 SR5199 HN2951 HN5038 HS5160 HB5...

Page 14: ... TO CHANGES IN DESIGN AND MANUFACTURING COPYRIGHT 2019 JAYPRO SPORTS LLC ALL RIGHTS RESERVED Sheet 14 of 18 INNOVATION PERFORMANCE AND COMMITMENT SINCE 1953 N366FB N68FB SYSTEM OVERVIEW Refer to the proper table for the cut drill requirements for the proper face of bank Make sure to slide on the brace clamp to frame piping before installing N68FB N366FB HM6273 CN0001 HM6252 ...

Page 15: ...UBJECT TO CHANGES IN DESIGN AND MANUFACTURING COPYRIGHT 2019 JAYPRO SPORTS LLC ALL RIGHTS RESERVED Sheet 15 of 18 INNOVATION PERFORMANCE AND COMMITMENT SINCE 1953 N810FB SYSTEM OVERVIEW Refer to the proper table for the cut drill requirements for the proper face of bank Make sure to slide on the brace clamp to frame piping before installing N810FB HM6273 CN0001 HM6252 ...

Page 16: ...JAYPRO SPORTS LLC ALL RIGHTS RESERVED Sheet 16 of 18 INNOVATION PERFORMANCE AND COMMITMENT SINCE 1953 SYSTEM OVERVIEW BACKSTOPS WITH CHAIN SUPPORT Unit shown is for 6 0 to 8 0 face of bank backstops The support chains and internal bracing may vary slightly from other units HS7820 HN265 DETAIL M X BRACING HORIZONTAL WOOD STRINGERS HORIZONTAL FRAME PIPES X3 FRAME BRACING QTY DEPENDS ON FACE OF BANK ...

Page 17: ...CE AND COMMITMENT SINCE 1953 N366FB N68FB N810FB ASSEMBLY DETAILS Refer to the proper table for the cut drill requirements for the proper face of bank Make sure to slide on the brace clamp to frame piping before installing HB5045 HN5038 D PLATE OS HM6252 CN0001 WH 35 HB5045 HS2129 SR5293 HW3078 FRAME MEMBER HN5046 BRC190 BRACING CROSS BRACING HN265 HS2870 HS2129 HN2951 HS286 HW334 SR5295 HW3078 FR...

Page 18: ...rts Equipment at 1 800 243 0533 during regular business hours for any technical support questions or issues Refer to the applicable Wall Mount Model Number when talking to customer service personnel www jaypro com 3 Pt Stationary Wall Mount Backstop Installation Operating Manual N2FB N236FB N366FB N68FB N810FB www jaypro com 800 243 0533 976 Hartford Tpke Waterford CT 06385 USA SUBJECT TO CHANGES ...

Reviews: