ASSEMBLY & MAINTENANCE INSTRUCTIONS
PAGE 5
1:
Support Posts -
D
ig holes 600x600 square x 600mm
deep at the centres of 3710mm as shown in the
diagram to the left. Position the Support Posts
FEQ863 360mm centrally back from the front of the
(court side) of the fence/kick board. Concrete the
Supports in 500mm deep leaving approx 150mm from
the top of the concrete to ground level (for turf) use a
spirit level to make sure that the Supports are truly
vertical. Replace the turf extracted when the concrete
has cured.
(Allow the concrete to set before assembling the rest
of the goal)
2: U
npack all the parts and lay out on the ground
1957.5
77.5
152.5
3:
FEP311.
C
ut a hole in the fence and assemble Arms to the
Support Posts -
directly in front for each Support
measure up from the ground level 152mm
and
2017mm to square centre and cut a square hole 110mm
wide x 110mm high in the fence (or kick board). Fix the
support arms (FEP106) at the bottom using
SEP497,BOL710, BOL202 into position. Do the same at
the top but using
Please note at least 2 people required to assemble this goal
FEP311
FEP106
SEP497
BOL712
BOL202
SEP497
BOL712
BOL202
FEQ863
FEQ863
PLAN VIEW
SIDE VIEW
Fence Line
600
600
600
360
Socket
centre
to
front
of
fence/
kick
board
40
Play Area
3710
2017
2170
500
Support
Post
Insertion