Constellation™
2002 June 20
I-12
traffic-affecting procedure 4-28
,
training centers 13-7
training, customer 13-6
transmit monitor port
,
,
measuring the reference frequency 4-7
off-line, measuring power 4-28
record operating frequency 4-24
removing and installing multiplier-filter
Transmitter Assembly A1, replacement
,
,
transmitter measurements record 4-1
transmitter power, request for increased
Transmitter switch, turning on 4-7
Transmitter, temperature reading B-7
transmitter, termination of 2-2
trap
tributary BER test 5-11
tributary loopback test 5-3
tributary remote loopback test 5-4
troubleshooting
turning on
,
twisted-pair cable 8-2
two separate loop systems D-5
U
unpacking procedure 3-2
unrepairable units 13-3
V
verify grounding 2-2
verifying RF output power 4-7
VersaT1lity port 10-3
version, software 11-1
VF port 10-3
VF ports
voltmeter, digital 12-3
VT100 terminal emulator B-1
VT100-compatible terminal 1-16
W
warming up the Constellation 4-7
warning labels 2-1
warnings 2-1
warranty 13-1
other equipment manufacturer 13-7
warranty period 13-7
watchdog 10-10
waveguide
waveguide termination 4-19
wayside connector 10-3
wayside port
,
,
Summary of Contents for Constellation
Page 1: ...Point to Point Digital Radio Constellation Installation Maintenance next level solutions ...
Page 2: ......
Page 3: ...Constellation Microwave Radio INSTALLATION AND MAINTENANCE MANUAL June 20 2002 IMN 112871 E07 ...
Page 16: ...Constellation 2002 June 20 TOC 12 ...
Page 20: ...Constellation 2002 June 20 2 ...
Page 76: ...Constellation 2002 June 20 4 34 ...
Page 136: ...Constellation 2002 June 20 10 12 ...
Page 150: ...Constellation 2002 June 20 11 14 ...
Page 186: ...Constellation 2002 June 20 12 36 ...
Page 210: ...Constellation 2002 June 20 A 16 ...
Page 236: ...Constellation 2002 June 10 F 2 ...
Page 240: ......
Page 242: ......
Page 248: ...Constellation 2002 June 20 G 6 ...
Page 262: ...Constellation 2002 June 20 I 14 ...
Page 263: ......