Constellation™
2002 June 20
4-32
Recording the Power Levels.
p. Record the power levels along with the date and the name of the person
making the measurement in the “Routine Maintenance Log Form”
(
Off-line Transmitter.
q. When you have finished taking the measurement, you can either leave
the Transmitter on line or return it to the off-line status.
r. The standby Transmitter is now the primary Transmitter.
Switching the traffic back to the previous
Transmitter
will cause a hit.
If switching of Transmitter Assemblies is desired,
it should be done during low-traffic hours.
19. Perform loopback tests (through the Keypad) (
).
20. Perform BER tests from the Keypad.
PERFORMANCE > TRIBUTARY
Aligning the Antenna
21. Align the antenna.
The Keypad reading is not as accurate as using the
RSL/GND test points.
a. Connect a multimeter at the RSL/GND test point of the Receiver
Assembly.
b. Adjust the orientation of each antenna to maximize the voltage
reading.
Summary of Contents for Constellation
Page 1: ...Point to Point Digital Radio Constellation Installation Maintenance next level solutions ...
Page 2: ......
Page 3: ...Constellation Microwave Radio INSTALLATION AND MAINTENANCE MANUAL June 20 2002 IMN 112871 E07 ...
Page 16: ...Constellation 2002 June 20 TOC 12 ...
Page 20: ...Constellation 2002 June 20 2 ...
Page 76: ...Constellation 2002 June 20 4 34 ...
Page 136: ...Constellation 2002 June 20 10 12 ...
Page 150: ...Constellation 2002 June 20 11 14 ...
Page 186: ...Constellation 2002 June 20 12 36 ...
Page 210: ...Constellation 2002 June 20 A 16 ...
Page 236: ...Constellation 2002 June 10 F 2 ...
Page 240: ......
Page 242: ......
Page 248: ...Constellation 2002 June 20 G 6 ...
Page 262: ...Constellation 2002 June 20 I 14 ...
Page 263: ......