- 3 -
V1-02-06
Assembly instructions pivot arm awnings US701 - US702 - US715
Guarantee and conditions :
- Harol has endeavered to design and assemble this sun protection in accordance with the ruling and
valid CE-norms. Nevertheless, feel free at any time to countercheck these interpretations with your
local national institute of normation.
- From this manual no rights can be derived. Technical alterations are possible without prior notifica-
tion.
- When dealing with larger projects, we do advise you to implement a full installation of 1 sun protec-
tion before starting with the installation of the rest of the sun protections. This way, an oversight or a
small mistake can be detected in its earliest and least expansive stadium.
- For our general conditions of sale: see pricelist.
Harol NV
Industriepark 3 - 3290 Diest
Belgium
Tel. +32 (0)13 38 01 11
Fax. +32 (0)13 31 48 03
E-mail: [email protected]
Internet: www.harol.com
C. List of tools required
- ladder(s)
- roller meter
- electric drill
- cross-head and flat-head screwdrivers
- set of open-ended or ring spanners
- ruler and pencil
- set of masonry drills Ø8mm – 12mm
- set of metal drills Ø 8mm – 10mm – 16mm
- level, waterhose, plumb line
- cord
- voltmeter or testing lamp 220 V
- test cable and switch