AL625 & AL625HD
Page 13
REV: 1-24-12
After the actuator is extended, lift the Front Boom Weldment and swing the Upper Boom Frame onto the Front
Boom Weldment and align the holes; put the bolt in. Secure the bolt with the nylon insert locknut.
Move unit out approximately 2” & remove (2) wood blocks located in tracks used to prevent
shipping damage.
Next you will determine if you should remove the High Threshold Kit that comes with your Trolley Assembly.