![Hardy LC300 Installation And Operating Instructions Manual Download Page 26](http://html1.mh-extra.com/html/hardy/lc300/lc300_installation-and-operating-instructions-manual_3911318026.webp)
HARDY MANUFACTURING CO., INC (MODEL LC300, LC500 & LC2500)
PAGE 12
2-6
Connection of Power to Heater
This unit must be wired by a qualified electrician
in accordance with the National Electrical Code.
The #12/2 W/G UF wire is run from the electrical system in the Building through the 4”
watertight pipe or other insulation means to the heater.
This wire will connect to the Ground Fault Circuit Interrupter (GFCI) on the back of the
heater.
Install a Romex Connector in the bottom of the electrical makeup box, and insert
Romex wire through this connector.
Connect the black wire to the brass screw on the line side of the GFCI receptacle.
Connect the white wire to the silver screw on the line side of the GFCI receptacle
Connect the bare copper wire to the green screw on the GFCI receptacle.
After the wiring is complete, and power is applied, check the receptacle with a circuit
tester to determine if the polarity is correct, and to make sure the ground is connected.
Press the test button on the GFCI receptacle. The reset button should pop out
indicating the interrupter is operating correctly. Push the reset button back to restore
the GFCI receptacle to normal operation. This test should be done monthly to insure
safe operation of the heater.
If moisture is allowed into the Ground Fault Circuit Interrupter box, it will have a
tendency to trip unwarranted. Measures should be taken to keep the box dry.
Summary of Contents for LC300
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 10: ... MODEL LC300 LC500 LC2500 viii THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 70: ......
Page 71: ......
Page 72: ......