DOCUMENT REVISION RECORD
Date
Document
Revision
Level
Description
October 29, 2010
-
Initial release.
November 5, 2010
-
Updated Figure 1.2.
November 18, 2010
-
Updated coolant tank installation, Chapter 1.
Added note for flexible electrical connection.
Updated coolant tank maintenance, Chapter 2.
January 10, 2011
-
Added fluid spill warnings to Chapters 1 and 2.
January 27, 2011
-
Updated electrical connection, Chapter 1.
Updated hydraulic tank fill procedure, Chapter 1.
Updated lubrication procedure, Chapter 2.
February 14, 2011
A
Added coolant chiller information.
February 1, 2012
B
Added T-51 and T-65 lathes.
February 17, 2012
B
Updated coolant tank installation.
Added guard door shipping bracket for T-51 and T-65 lathes.
April 24, 2012
C
Added new T-51/T-65 machine footprint illustration.
Updated shipping bracket information.
May 23, 2012
C
Updated serial number information for T-51 and T-65 machine foot
locations.
July 25, 2012
C
Updated electrical requirements.
M-507C
R-1
Summary of Contents for T-42
Page 8: ... NOTES vi M 507C ...
Page 50: ... NOTES 1 42 M 507C ...
Page 84: ... NOTES 2 34 M 507C ...