SETTING THE MACHINE
- NOTE -
Review the machine installation requirements on page 1-1 before beginning the
installation.
1. Verify that the foundation for the machine meets the requirements, as outlined on page 1-1.
2. Leave the machine on the skid and move it to the installation location.
3. Remove any parts boxes from the skid.
- NOTE -
Retain the M12 screws, washers, lock washers, and hold-down brackets in the
event the machine is to be used with a bar feed system. Refer to page 1-6 for
information on securing the machine to the floor.
4. Remove the M12 screws, washers, and lock washers that secure the hold-down brackets to the
machine.
5. Remove the hold-down brackets from the skid.
6. Thread the adjustable foot, shown in Figures 1.1 through 1.3, all the way up for clearance.
Initially, the machine is supported by the three non-adjustable feet.
- WARNING -
Raise the machine high enough to make certain that the machine feet and sup-
port screws clear the skid.
- NOTE -
There are two lift slots running front to rear under the machine base. Refer to
Figure 1.1, 1.2, or 1.3. Lift the machine slowly to make certain that the fork lift
truck maintains balance.
7. Use a fork lift truck or the rigging to lift the machine from the skid. Lift the machine slowly while
making certain that it remains balanced.
8. Carefully lower the machine into position. The machine will be supported by the three
non-adjustable feet. Rough align the machine.
9. Thread the adjustable foot down until it makes contact with the floor.
10. Tighten the adjustable foot an additional one-sixteenth turn.
11. Secure the adjustable foot lock nut up against the machine base.
M-507C
1-5
Summary of Contents for T-42
Page 8: ... NOTES vi M 507C ...
Page 50: ... NOTES 1 42 M 507C ...
Page 84: ... NOTES 2 34 M 507C ...