21
HARDI
MEGA 230 / 350 CENTRIFUGAL OPERATORS MANUAL
4.7 Attaching Feed Hoses (cont'd)
4.8 Performing Final Inspection
1. Check hydraulic system for leaks.
2. Check hydraulic hoses for clearance and freedom of movement
throughout entire range of operation.
3.Check feed hoses for freedom of movement through out range of
operation
4. Lubricate all machine lubrication points. (Refer to section 7)
5. Adjust machine for field operation. (Refer to section 8)
6. Ensure all fasteners are tightened correctly.
Fig. 9