19
HARDI
MEGA 230 / 350 CENTRIFUGAL OPERATORS MANUAL
4.6 Adjusting Center Cables
NEVER ATTEMPT TO ADJUST THE CENTER CABLES WITHOUT
HAVING THE BOOM FOLDED ALL THE WAY INTO THE
TRANSPORT POSITION!
The center cables work together to keep the floating frame square to the
stationary frame, while folding the boom in for transport or when spraying
with one side raised and folded.
1. Fold boom into transport position.
2. Shut the tractor off.
3. Check that tilt cylinders are COMPLETELY EXTENDED. Adjust if
necessary.
4. Loosen jam nuts. (B).
IMPORTANT: Alternate from side-to-side while making
adjustments. Adjust one cable a small amount, and
then the other, to equalize cable tension and maintain
a level center frame.
Fig. 8