PARTS LIST
DESCRIPTION
QTY
PART NUMBER
ITEM
O RING BS020/90
2
013256
1
BACK UP RING
1
013257
2
O - RING
1
013279
3
GLYDRING
1
015043
4
DOWTY SEAL 3/8"
2
015097
5
DIAPHRAGM
1
100186
6
BANJO DELIVERY BLOCK 3 PORT
1
100316
7
BOLT DELIVERY BANJO
1
100333
8
PIN SPIRAL TYPE 5/65" OD 5/8" LG
1
100348
9
BARREL Mk 4 CENTURY
1
100497
10
COLLAR
1
100498
11
NUT INLET
1
100499
12
MANDREL
1
100672
13
SPRING INLET
1
037107
14
VALVE INLET
1
100674
15
STOP INLET VALVE
1
100675
16
SEAT INLET
1
100676
17
SEAT HE DELIVERY VALVE
1
100738
18
RING HE DELIVERY VALVE
1
100739
19
SPRING HE DELIVERY VALVE
1
100740
20
NUT HE DELIVERY VALVE
1
100744
21
2004
DRAWN
CHECKED
APPROVED
SCALE
WEIGHT
FINISH:
TITLE
DRG NO
PART NO
ISSUE
DATE
DRAWN
CHECKED
STATUS
TEST
INFORMATION FOR ESTIMATION OF WEIGHT AND COST ONLY
MATERIAL LIST
ITEM PART NO. MATERIAL SPEC SIZE
WT
mm Kg
Kg/M
LENGTH TOTAL WT
QTY.
PARTS LIST
ITEM PART No. DRG. No QTY DESCRIPTION REMARKS
EXPOSED
AREA
PROTECTION
USED ON
SUPERSEDES/SUPERSEDED BY
A B C D E F G H J K
L M N P R S T U V W
X Y Z
Gemini House, Brunel Rd, Churchfields,
Salisbury, Wiltshire, England. SP2 7PU
Tel: (01722) 325424 Fax: 01722 411329
ALL DIMENSIONS IN MILLIMETRES
GEOMETRICAL TOLERANCES TO BS 308
ANGULAR DIMS TO BE WITHIN:-
MACHINED 0.5 , BENDING 2
THREADS: BSP, TO MED. FIT. B.S. 2779
ISOMETRIC TO 6g / 6H
TOLERANCES TO BE AS SPECIFIED BELOW UNLESS OTHERWISE STATED
30
UP TO AND INCLUDING
FABRICATION
UNMACHINED
* DELETE
ONE
RANGE
0.5
* MEDIUM
MACHINING
* FINE
MACHINING
0.3
0.1
OVER
0
100
2000
1000
300
SURFACE ROUGHNESS: 1.6 MICRONS Ra
CONCENTRICITY TO WITHIN 0.2 T.I.R.
M/C RADII 1.5
DRILLED HOLES +0.13/-0.00
HOLE CENTRES TO BE 0.2
REMOVE ALL BURRS & SHARP EDGES.
2.0
1.0
0.3
1.0
1.5
0.5
0.15
0.7
0.2
3.0
3.0
1.5
0.5
2.0
0.8
300
30
100
1000
2000
DATE
DATE
DATE
DO NOT SCALE
IF IN DOUBT ASK !
MANUFACTURERS UNABLE TO COMPLY MAY
SUBMIT ALTERNATIVES WHEN QUOTING.
ALL DRAWINGS NOT TO THE LATEST
ISSUE ARE TO BE DESTROYED.
Flowplant Group Ltd.
C COPYRIGHT
Flowplant Group Ltd.
THIS DRAWING IS CONFIDENTIAL AND IS SUPPLIED
ON THE EXPRESS CONDITION THAT IT IS NOT
COPIED OR COMMUNICATED TO OTHER PERSONS
OR COMPANIES WITHOUT WRITTEN PERMISSION
FROM
FLOWPLANT GROUP LTD.
A
B
C
D
E
F
2
1
3
4
5
6
7
8
A
B
C
D
E
F
CALC
Third angle projection
L E A D E R S I N C L E A N I N G T E C H N O L O G Y
HEAT TREATMENT
8
5
7
5
21
20
18
19
10
12
11
17
2
1
15
14
16
4
13
9
6
3
1
2
22/03/17
GHM
220317/A
70
Summary of Contents for CENTURY
Page 14: ...Section 1 Pump Technical Data 11 ...
Page 25: ...Section 2 Pump Installation 22 ...
Page 32: ...Section 3 General Operating Information 29 ...
Page 47: ...Section 4 Pump Maintenance and Overhaul Procedures 44 ...
Page 68: ...Fig 4 4 Century pump Assembly 65 ...
Page 69: ...66 ...
Page 77: ...Section 5 Warranty 74 ...