Flowplant Century Pump Manual
4.3.8 Renewing Crankcase Components
Once the crankcase has been opened (Para 16) the following major repairs/replacements
can be carried out:
a) Change Float Bearing (13)
–
4.3.8.1
b) Change Bearing (12)
–
4.3.8.2
c) Change Cylinder (25), Piston (26) and Slipper (27)
–
4.3.8.3
d) Change Bearing (11)
–
4.3.8.4
e) Change Oil Seal (81)
–
4.3.8.5
Note:The following procedures must be carried out sequentially. On completion of
repairs/replacement of pump components, the pump should be re-assembled using the
procedure detailed in Para 23.
4.3.8.1
Change float bearing (13)
i.
Remove Nuts (86) and Washers (103) to remove Bearing Retainer (9).
ii.
Using a press, remove the Float Bearing (13). The Bearing may be pressed out from
either side.
iii.
Fit a new Bearing (13). The Bearing may be pressed in from either side, but the Circlip
in the Bearing must face the inside of the Crankcase.
Note: When fitting the Bearing (13), only press on to the outside race and not the
inner race. Dolly(part no 201-011) is available for this purpose.
iv.
Press in the Bearing so that 3 mm protrudes through the outside of the Crankcase.
v.
Refit Bearing Retainer (9).
vi.
Press Bearing fully home so that it locates up against the 'stop' in the Bearing Retainer
(9).
59
Summary of Contents for CENTURY
Page 14: ...Section 1 Pump Technical Data 11 ...
Page 25: ...Section 2 Pump Installation 22 ...
Page 32: ...Section 3 General Operating Information 29 ...
Page 47: ...Section 4 Pump Maintenance and Overhaul Procedures 44 ...
Page 68: ...Fig 4 4 Century pump Assembly 65 ...
Page 69: ...66 ...
Page 77: ...Section 5 Warranty 74 ...