
17
INST
ALLA
TION
Reservoir Immersion Installation
Detailed below a representation of a reservoir immersion installation scheme together with the
relevant components and the EC probe screwed into the threaded end of a user supplied pipe and
fastened with a bracket.
3/4
”
NPT
Waterproof assembly
1
2
4
3
1
Electrode holder tube
2
Bracket
3
Reservoir
4
Probe
Note:
It is recommended to keep the waterproof probe fastened during measurements and that
only the probe body is continuously submerged.