COMPRESSOR INSTALLATION & START-UP GUIDE
REVISION M
15
7.6. How to Wire INT69HBY Diagnose
The following diagram shows the proper wiring connections for the module. The module is connected
to L1, L2 and L3 for phase monitoring. Stake on connectors at terminal “A” are connected in series with
the discharge PTC and wired back to S1 and S2.
Summary of Contents for RC2 Series
Page 10: ...COMPRESSOR INSTALLATION START UP GUIDE REVISION M 10 Figure 5 A Motor Wiring...
Page 16: ...COMPRESSOR INSTALLATION START UP GUIDE REVISION M 16 Chapter 8 RC2 100 140 Installation Guide...
Page 17: ...COMPRESSOR INSTALLATION START UP GUIDE REVISION M 17 Chapter 9 RC2 170 580 Installation Guide...
Page 18: ...COMPRESSOR INSTALLATION START UP GUIDE REVISION M 18 Chapter 10 RC2 710 930 Installation Guide...