
MP5A Operation and Maintenance Manual
________________________________________________________________________________________________________________
Copyright
©
2023
‐
2024
Halogen
Systems,
Inc.
All
rights
reserved
worldwide.
Rev.:
4.02
7
4.2.
Flow Cell Install
The
Sensor
is
shipped
dry.
The
pH
portion
of
the
sensor
will
wet
and
stabilize,
producing
accurate
readings
within
5
minutes.
Follow
the
procedure
below
to
prepare
the
chlorine
sensor
for
operation:
1.
Mount
the
flow
cell
on
a
vertical
surface.
2.
Insert
the
sensor
into
the
acrylic
flow
cell
with
the
outlet
port
of
the
sensor
facing
up
3.
Seat
the
sensor
until
the
flange
is
flush
with
the
top
of
the
flow
cell.
4.
Thread
the
collar
down
until
it
stops.
Hand
tighten
only.
4.2.1
Flow Cell Orientation
Note
that
the
orientation
of
the
flow
cell
is
important.
The
flow
cell
must
be
installed
in
a
vertical
position.
4.3.
Halogen CN
‐
04 Display Installation
Intended
Use:
for
use
with
all
Halogen
Sensors
for
non
‐
shipboard
use.
Display
Mounting
1.
Select
a
mounting
location,
preferability
at
eye
level
for
easy
visibility
of
display
screen.
Display
should
be
no
less
than
2
feet
from
the
ground.
2.
Determine
what
type
of
wall
display
is
going
to
be
mounted
to,
using
four
(4)
#6x1”
screws
rated
for
the
correct
surface.
Sensor
Wiring
3.
Connect
the
M12
sensor
cable
into
the
center
connector
as
shown
below: