64
CAUTION
R-410A specified tools
Remarks
1 Gauge manifold
Range: HP
>
4.5MPa, LP
>
2MPa
2 Charge hose
Pressure: HP: 5.3MPa, LP: 3.5MPa
3 Electronic balance for charging R410A
Can not use the measurable charging tank
4 Torque spanner
5 Flare tool
6
Copper pipe gauge for adjusting projecting margin
7 Vacuum pump adapter
Must be with reverse stop valve
8 Leakage detector
Can not use freon leakage detector, but the He detector
• Execute earthing for the unit. But the earthing wire can not be connected to the gas pipe, water pipe, lightening rod
or the telephone earthing wire. Improper earthing will cause electric shock.
• Don't install the unit at the place where leaks the flammable gas. Or it will cause fire.
• Execute the water drainage pipe according to the manual, improper installation will cause water leakage to wet the
family things.
• The outdoor fan can not face to the flower or the other vegetable, or the blowing gas will make the flower dried up.
• Please ensure the maintenance room, if not, it will cause the maintenance person damaged.
• When installing the unit on the roof or the other high place, to prevent the person falling down, please set the fixed
ladder and the railing at the passage.
• Use the two-end spanner, and fasten the nut at proper torque. Don't fasten the nut excessively against the flared
setion broken. Or it will cause refrigerant leakage and lack of oxygen.
• Take measures for heat insulation to the refrigerant pipe, or there will be water leakage or dew drop to wet the
family things.
• After finishing the refrigerant pipe, make leakage test by charging the nitrogen. In case the refrigerant leaks in a
small room and exceeds the limited concentration, it will cause lack of oxygen.
•
Don't use the other refrigerant except for R410A. The R410A pressure is 1.6 times higher than R22 pressure. The
refrigerant R410A tank is marked with pink sign.
• Against charging different refrigerant, we changed the stop valve diameter of the R410A unit. To enhance
the compression consistance, we also changed the flared pipe dimension. Prepare the R410A specially tools
according to the below table.
•
W
hen charging refrigerant, the refrigerant must be taken out as liquid state from the tank.
•
W
hen installing indoor unit, outdoor, power cable and connecting wire, leave them at least 1m away from the TV
set or the radio against interference for the image or the noise.
•
I
n the room with fluorescent lamp (reverse phase or rapid start type), the remote signal may be not reach the pre-
set distance. The farther that indoor is away from fluorescent lamp, the better.
•
Wh
en loaded into a refrigerant, be sure to take it out of the tank.
•
In
stallation of indoor, outdoor, power lines and connections must be at least 1m away from the TV or radio to
avoid image interference or noise.
•
In
a room equipped with fluorescent lamps (RP or fast start), the remote control signal transmission distance may
not reach a predetermined value. The farther away the indoor machine is, the better it is.
•
The tightening torque of the stop valve refer to the following table
Operating valve size
(mm)
Fastening torque
(N.m)
Fastening angle
(°)
Recommended tool length
(mm)
Ø6.35
14~18
45~60
150
Ø9.52
34~42
30~45
200
Ø12.7
49~61
30~45
250
Ø15.88
68~82
15~20
300
Ø19.05
84~98
15~20
300
Summary of Contents for MRV 5-RC VP1-112B
Page 1: ...MRV 5 RC Service Manual SYJS 03 2019REV A Edition 2019 03 ...
Page 3: ......
Page 55: ...52 AV08 10 12 14IMVURA 4 Center of gravity x X 347 9587 y 471 5454 z 725 6683 y z ...
Page 56: ...53 AV16 18 20 22IMVURA x X 650 5962 y 380 7255 z 706 5342 y z ...
Page 106: ...103 2 Dimension 4 19 200 60 25 25 25 249 108 232 84 69 388 73 82 65 103 177 4 44 4 35 277 ...
Page 116: ...113 2 Preparation before installation ...
Page 162: ...159 One by one valve box PCB code 0151800186A 2 Valve box PCB photo and dip switch setting ...
Page 165: ...162 One by four valve box PCB code 0151800466 ...