146
Note 1:
For suction gas pipes, high pressure gas pipe and liquid pipes, gas pipe, flare connections shall be wrapped with
insulation materials (purchased locally) when their auxiliary insulation cylinders have been installed.
For installation of insulation materials for the flare
nut connections, it shall be cautioned that:
(1) Please connect it tightly so as to ensure no gas
leakage at both ends.
(2) The retaining clamp shall not be over tight so
as to ensure the thickness of the insulation
materials.
(3) Joints of insulation materials (purchased locally)
for the upper flare nut connections shall be
wrapped upwards.
(4) Ensure that joints of the insulation materials are
installed upwards. (See Fig.13.)
Fig.13
Auxiliary pipe
Seal
Valve box
Bind both ends with tie wire
Field pipe
side of the
insulation pipe
Tube side of vale box of the insulation pipe
Summary of Contents for MRV 5-RC VP1-112B
Page 1: ...MRV 5 RC Service Manual SYJS 03 2019REV A Edition 2019 03 ...
Page 3: ......
Page 55: ...52 AV08 10 12 14IMVURA 4 Center of gravity x X 347 9587 y 471 5454 z 725 6683 y z ...
Page 56: ...53 AV16 18 20 22IMVURA x X 650 5962 y 380 7255 z 706 5342 y z ...
Page 106: ...103 2 Dimension 4 19 200 60 25 25 25 249 108 232 84 69 388 73 82 65 103 177 4 44 4 35 277 ...
Page 116: ...113 2 Preparation before installation ...
Page 162: ...159 One by one valve box PCB code 0151800186A 2 Valve box PCB photo and dip switch setting ...
Page 165: ...162 One by four valve box PCB code 0151800466 ...