GB
10-Installation
27
10.1 Preparation
▶
Take the appliance out of the packaging.
▶
Remove all packaging material including protecting film on cabinet, polystyrene base,
keep them out of childrens reach. While opening the package, water drops may be
seen on plastic bag and porthole. This normal phenomenon results from water tests
in the factory.
10.3 Dismantle the transport protection
The transport protection on the rear side is designed
for clamping anti-vibration components inside the ap-
pliance during transportation to prevent inner damage.
All elements (I,R,S and T , fig. 10-4) must be removed
before use:
Note: Packaging disposal
Keep all packaging materials out of children´s reach and dispose them in an environmen-
tally friendly manner.
Only for some countries
OPTIONAL: Adjusting the bottom cover board
When opening the shrink package, you will find a calci
-
um-plastic board and a felt. The board is used for re-
ducing noise after covering the bottom of the cabinet.
1. Past the felt on one side of the calcium-plastic
board (Fig. 10-1).
2. Lay the washing machine down to its side, porthole
pointing upwards, bottom side towards operator and
screw off the four bolts (Fig. 10-2).
3. Place the calcium-plastic board with felt towards
inside, screw the bolts through the four holes on the
board on to the tub firmly (Fig. 10-3). Finally set the
machine upright again.
10-1
10-2
10-3
T1
T2
T3
T4
I1
I2
R1
R2
R3
R4
R5
R6
R7
R8
R9
R10
S1
S2
10-4
T1
T4
T3
T2
10-5
1. Remove all 4 bolts (T1-T4) (Fig. 10-5).