Installation, handling and maintenance
Technical changes reserved
75
Step
Action
9
Fit the top and bottom flanges.
10
Tighten all the bolts.
11
Insert the seals.
12
Prepare the casting resin mixture according to the instructions and then
fill the joint block.
13
Seal the filling hole with the cover.
Result: The connection has been made.
-
Observe the assembly instructions for safe assembly.
It is not permissible to fit a fire barrier over a joint block.
Summary of Contents for KEH31D00S3LMA
Page 1: ...Busbar system unibar H System manual 800 A to 4000 A...
Page 10: ...Construction and characteristics 10 Technical changes reserved...
Page 19: ...Construction and characteristics Technical changes reserved 19 Notices...
Page 40: ...Product selection 40 Technical changes reserved Copper...