
Single zone AOV User Manual
INSTALLATION
25
Approved Document Ref: UI-SZAOV-01 Issue 2.01
Knockouts should be removed with a sharp tap at the rim of the knockout using a flat 6mm
broad bladed screwdriver. Use of excessive force will damage the enclosure around the
knockout.
Mains Connections
Note:
All connections must be carried out in accordance with local requirements and
regulations.
Do not connect the mains supply to the panel until you are fully conversant with the layout
and features of the equipment.
A rating plate is attached to the power supply module, describing the nature of the supply
permitted.
The incoming mains supply should be brought into the panel via one of the knockouts
provided.
A suitable cable gland must be used, to secure the outer sheath of the cable used. The earth
must first be connected to the primary earth stud (peg) marked with a
symbol, using a
suitable ring crimp.
Sufficient earth lead should be left, to allow Live and Neutral connections to be accidentally
pulled from the terminal block while leaving the earth connection intact.
Summary of Contents for SZAOV
Page 45: ...www haes tech com ...