Positive Stop System (Continued)
53
17. Replace the workpiece in the proper position to insert the hardware.
18. Depress the Down Footswitch. The Upper Tool will move down, contact the work piece, and
stop.
19. Depress the Down Footswitch a second time, the machine will insert the hardware, and stop.
20. Depress the Up Footswitch until the Upper Tool is in a position such that you can remove the
hardware and work piece easily.
21. Examine the hardware to ensure it has been inserted properly.
22. If the hardware has not been completely inserted, lengthen the stroke by turning the Tube
Assembly clockwise,
a. 1/8 of a revolution will equal 0.01 inches (0.25mm) increase in stroke length.
b. 1/4 of a revolution will equal 0.02 inches (0.50mm) increase in stroke length.
23. If the hardware has been over-inserted (inserted too far or damaged), shorten the stroke by
turning the Tube Assembly counter-clockwise,
a. 1/8 of a revolution will equal 0.01 inches (0.25mm) decrease in stroke length.
b. 1/4 of a revolution will equal 0.02 inches (0.50mm) decrease in stroke length.
24. Repeat Steps 17 through 24 until the hardware has been properly inserted.
25. Lock the Tube Assembly in position by tightening the LOCKING KNOB.
26. Replace the ACCESS PANEL.
27. To start production, set the Run/Setup Switch to the Run position.
28. If you are not going to use the Non-Conductive Mode in this production run, have your
supervisor use their key to select the Conductive Mode of operation.
Summary of Contents for 618 MSPe
Page 1: ...618 MSPe Operation Manual ...
Page 66: ...62 Main Assembly ...
Page 69: ...65 Sheet Metal ...
Page 72: ...68 Dual Safety Sensor Assembly ...
Page 78: ...74 Electrical Cabinet ...
Page 81: ...77 Hydraulic Reservoir Assembly ...
Page 83: ...79 Hydraulic Manifold Subassembly ...
Page 87: ...83 MAS 9 Autofeed Optional ...
Page 89: ...85 MAS 350 Autofeed Optional ...