background image

 

 

 

 

5.52.208.00.01.07 

 

 

13 

 

11 

Maintenance 

 

 

11.1 

General 

All  monitoring,  servicing  and  maintenance  operations  are  to  ensure  correct  functioning  of  the  equipment; 
they must be effected with utmost care. 

  Only 

“qualified persons” may do this work. 

  Servicing and maintenance work must only be done when the hoist is not loaded. 

  Records must be kept of all test results and measures taken. 

 

11.2 

Monitoring 

The monitoring and servicing intervals stated are valid for operation under normal conditions and single-shift 
operation.  In  case  of  severe  operating  conditions  (e.g.  frequent  operation  with  full  load)  or  special 
environmental conditions (e.g., heat, dust, etc.), the intervals must be shortened correspondingly  

 

 

12 

Inspection 

 

 

12.1 

Periodic checks 

Independently from the regulations of the individual countries, lifting devices must be checked at least yearly 
by a qualified person or licensed qualified person regarding its functional safety.  

 

12.2 

Wire rope 

Adequate  performance  of  the  servicing  and  monitoring  work  acc.  to  the  validated,  national  regulations 
“Basics for cable drives – monitoring during use”. 
A visual check must be effected before every new work shift. 

  Wear 

  Deformation 

  Fissures 

  Corrosion 

Report any damage immediately to the responsible person and exchange damaged or worn wire ropes and 
load tackles. 

 

12.3 

Inspection intervals 

 

on commissioning 

daily checks 

1st service after 3 

months 

inspection, 

service every 3 

months 

inspection, 

service every 12 

months 

 

Inspection of the equipment by a qualified person (periodic 

inspection) 

 

 

 

 

 

Check screw connections 

 

 

 

 

Check brake function 

 

 

 

 

check brake air gap (only for electric devices) *) 

 

 

 

 

 

check overload protection if existent 

 

 

 

 

 

clean and lubricate the wire rope 

 

 

 

check wire rope and wire rope end fastenings for damage 

and wear 

 

 

 

 

 

 

check the load tackle and load hook for cracks and 

deformation 

 

 

 

 

 

 

 

*) not for EX design 

 

13 

Service 

 

 

13.1 

Wire rope 

Wire ropes have to be exchanged by new, original wire ropes if they show corrosion, fracture or if they are 
worn. 

Checks: 

  Fastening screws must be checked before commissioning and at least every 3 months, - tighten them if 

necessary. 

  Kind and number of broken threads. 

Summary of Contents for 238/10MV

Page 1: ...00 01 07 Rev 07 HADEF Manual Worm Gear Wire Rope Winch as standard version Type 238 10 as galvanized version Type 238 10GV as Marine version Type 238 10MV Installation Operating and Maintenance Instr...

Page 2: ...y 3 2 1 Warning notice and symbols 3 2 2 Duty of care of the owner 4 2 3 Requirements for the operating personnel 4 2 4 Appropriate use 5 2 5 Basic safety measures 5 3 Transport and Storage 6 3 1 Tran...

Page 3: ...he stated performance of the devices and meeting any warranty claims require adherence to all instructions in this manual Before delivery all products are packed properly Check the goods after receipt...

Page 4: ...are important for the special kind of use of the equipment i e regarding organization of work work flow and human resources In particular the owner user must ensure that The unit is only used appropri...

Page 5: ...xceeded Vertical lifting and lowering of unguided loads horizontal movement of loads and inclined movement of loads movement of flaps covers etc 2 4 1 Winches with disengaging clutch as option Only fo...

Page 6: ...egulations for load carrying devices UVV for both positive and non positive methods of attaching loads The lifting tackle or the load must be securely attached to the hook and be seated at the bottom...

Page 7: ...risk from explosion 4 2 Design The wirerope winches for stationary use are fitted with holes for installation The winch handle is detachable The winch can be installed in any position desired make su...

Page 8: ...parating partition Capacity FEM group wir erope 2x nec minimum breaking load 2x useable wire rope length 2x number of rope layers 2x wire rope path per crank turn crank effort weight without rope appr...

Page 9: ...pes and special wire ropes are available on request Diameter and nec minimum breaking load must be acc to the data mentioned in the table in chapter Technical Data resp acc to the details mentioned on...

Page 10: ...ceeded maximum wire rope deflection angle 4 for standard wire ropes 2 for non twisting resp twist resistant wire ropes The minimum dimension M from the drum until the middle of the pulley must be adhe...

Page 11: ...Adjust the slipping clutch at the set ring 2 direction A brake pressure increases direction B brake pressure decreases 4 Tighten the safety screws 1 again Illustration 6 8 Commissioning 8 1 General Th...

Page 12: ...and distribute the fat with a paint brush over the worm gear wheel and the shaft Make sure that no fat gets on the load pressure brake A Install the protection plate again NOTICE To ensure correct fu...

Page 13: ...cing and monitoring work acc to the validated national regulations Basics for cable drives monitoring during use A visual check must be effected before every new work shift Wear Deformation Fissures C...

Page 14: ...3 4 Lubricant Selection FUCHS SHELL ESSO MOBIL TOTAL CASTROL KL BER Renolit FEP 2 Alvania EP 2 Unirex EP 2 Mobilux EP 2 MULTIS EP2 Stabylan 5006 Optimol Viscoleb 1500 Kl beroil 4UH 1 1500 Wolfracoat 9...

Page 15: ...c is stuck possibly due to seldom use loosen the brake by slightly pushing the winch handle by hand in direction lowering replace the brake discs if necessary 16 Decommissioning WARNING It is essentia...

Reviews: