30
Section 4
Commissioning
4.1 Placing instrument in operation
After assembly has been completed, you can place FILTRAX in operation.
For this purpose
1.
Clip pump cartridges into the control unit
2.
Unpack the two filter modules and carefully slide into the module carrier!
3.
Fit the two thicker sample tubes and the two thinner air tubes to tube fittings of
appropriate size as per the figure
4.
Plug into the mains and set instrument parameters (sec. 5 Software menu
system)
N O T I C E
The sample pressure tube must never be clamped such that it is blocked off - the
pressure build up would either result in damage to the tubes or the tube connections
would spring off!!
N O T I C E
As far as possible do not touch the delicate filter membrane!
Summary of Contents for Filtrax
Page 2: ......
Page 4: ...2 Contents Section 8 Spare parts 51 Section 9 Warranty and liability 53 Section 10 Contact 55 ...
Page 6: ...4 Technical data ...
Page 12: ...10 General information Fig 2 6 Filter module ...
Page 16: ...14 Installation Fig 3 9 Module carrier and filter module ...
Page 31: ...Installation 29 ...
Page 33: ...Commissioning 31 Fig 4 23 Inserting filter modules ...
Page 35: ...Commissioning 33 ...
Page 43: ...Operation 41 ...
Page 55: ...52 ...
Page 57: ...54 Warranty and liability ...