General information
9
2.5.3 Sample tubes
Fig. 2-5
Sample tubes
2.5.4 Filter modules
The two filter modules should only be installed during commissioning. Once
moistened, the filter membranes must not be allowed to dry out again and are
sealed in a plastic bag for protection.
1.
Sample tube 2 m,
∅
23 mm (0.91 inch), not heated
4.
Sample pressure tube 3.2 mm OD
2.
Sample pressure tube 3.2 mm OD
5.
Connecting cable for the tube heater
3.
Sample tube 10 m, 20 m, 30 m,
∅
23 mm (0.91 inch), heated
N O T I C E
The surface of the membrane is very delicate!
Summary of Contents for Filtrax
Page 2: ......
Page 4: ...2 Contents Section 8 Spare parts 51 Section 9 Warranty and liability 53 Section 10 Contact 55 ...
Page 6: ...4 Technical data ...
Page 12: ...10 General information Fig 2 6 Filter module ...
Page 16: ...14 Installation Fig 3 9 Module carrier and filter module ...
Page 31: ...Installation 29 ...
Page 33: ...Commissioning 31 Fig 4 23 Inserting filter modules ...
Page 35: ...Commissioning 33 ...
Page 43: ...Operation 41 ...
Page 55: ...52 ...
Page 57: ...54 Warranty and liability ...