3
Install the 30-Amp servo amplifier [1] into the
amplifier bank section that has the label "Tool
Turret."
Route the servo motor power and encoder cables
from the top of the electrical cabinet [2].
Connect the power wires to the high voltage
terminals on the amplifier [3]:
• red to RED
• white to WHT
• black to BLK
Install the jumpers [4] from the nearest amplifier
to the 30-Amp servo-amplifier:
• Connect the black wire to -H.V..
• Connect the red wire to +H.V..
Connect the ground stud [5] to the chassis.
Install the ferrite filter (NGC kits only) to the
motor power cables.
Connect the current command cable [6] to the
connector at the top of the amplifier to Maincon.
•
CHC:
P5
•
NGC:
Channel 7, P7
Connect the encoder cable to the Maincon [7].
•
CHC:
P9
•
NGC:
Channel 7, P23
4
Remove the cover [1] from the top of the
enclosure. This gives you access to the opening.
Put the turret power cable, encoder cable [3] and
the air tubes [2] through the opening in the
cabinet.
Put the air tubes [2] and cables [3] into the
coolant hose conduit [4].
TL-1/2 - ATT-4/8 Turret - Installation and Alignment - AD0304
Page 5 of 10 pages