2
Remove the cover [1] on the top of the electrical
cabinet.
Open the control cabinet door.
Install the air solenoid [2] into the air manifold.
Connect the air hoses to the air fittings [3].
Route the two small airlines through the cable
channel into the opening at the top of the control
cabinet [4].
Route the exhaust hose to the bottom of the
electrical cabinet and secure it in place with a zip
tie [5].
Put the air solenoid cable through the cable
channel and connect it [6].
•
CHC:
Connect the solenoid cable to the
extension cable label " TC UP SOL" that
came in the kit and plug it into the I/O
PCB P55.
•
NGC:
Connect to cable label "TC UP SOL
inside the cable track.
TL-1/2 - ATT-4/8 Turret - Installation and Alignment - AD0304
Page 4 of 10 pages