Installing the AP
Installation flowchart
Figure 3 Installation flowchart
Pre-installation tasks
Before installing the AP, perform the following tasks:
•
Power on the AP and connect the AP to the network. Examine the LEDs to verify that the AP is
operating correctly. For information about the LEDs, see "03-Appendix B LEDs and ports"
•
Record the MAC address and serial number of the AP for future use.
Determining the installation position
Determine the installation position by observing the following principles: