Installing the V100-E
Preparations
z
Before installing the V100-E, make sure that you have read through Chapter 2 Installation
Preparations.
z
Make sure all the requirements mentioned in Chapter 2 are satisfied.
Installation Flowchart
Figure 3-1
Installation flowchart for the V100-E
Normal?
Install the device to
the specified position
Connect the PGND cable
Connect the power cables
Connect the device to
a configuration terminal
Verify the installation
Turn on the power switch
Power off the device and
disconnect the power cables
Install a MIM (optional)
Connect the device to the
Ethernet network
Connect the power cables
and power on the device
Verify the installation
End
Turn off the power
switch
Troubleshooting
No
Yes
Start
Install the cabinet (optional)