Connecting the AC power cord
Follow these steps to connect the AC power cord to the V100-E:
Step1
Make sure that the grounding screw on the chassis is securely connected to the earth ground.
Step2
Make sure that the power switch is in the OFF position. Connect one end of the AC power cord to the
AC-input socket (PWR0) on the left end of the rear panel and the other end to the AC site power.
Step3
Connect one end of the AC power cord to the AC-input socket (PWR1) on the left end of the rear panel
and the other end to the AC site power. (Omit this step if only one AC power module is needed.)
Step4
Push the power switch(es) of the V100-E to ON position.
Step5
Check that the corresponding PWR LED on the front panel is on. ON means the power connection is
correct.
Step6
Check that the SYS LED on the front panel is on. ON means the hardware system is operating normally.
Verifying Installation
Each time you power up the V100-E during installation, verify that:
z
Enough clearance has been reserved around the ventilation openings of the device and the
workbench or rack is stable enough.
z
The power supply matches the requirements of the V100-E.
z
The PGND cable is correctly connected.
z
The V100-E is correctly connected to other devices, such as a console terminal.