
39
Step5
Click
Properties
in the HyperTerminal window to enter the
Switch Properties
dialog box. Click the
Settings
tab, set the emulation to
VT100
, and then click
OK
.
Figure 49
Set terminal emulation in Switch Properties dialog box
Booting the switch
Checking before power-on
Before powering on the switch, verify that:
•
The power cord is properly connected.
•
The power supply voltage meets the requirement of the switch.
•
The console cable is properly connected; the terminal or PC used for configuration has been started;
and the configuration parameters have been set.
Powering on the switch
The S5120-SI switches have the same Boot ROM display style. This document uses the Boot ROM output
information on the S5120-28P-SI as an example:
Starting......
************************************************************************
* *
* H3C S5120-28P-SI BOOTROM, Version 135 *