1-5
Installation tools and accessories
Figure1-2 Installation tools
Figure1-3 Installation accessories
Pre-installation checklist
Table1-5 Pre-installation checklist
Item
Requirements
Installation
site
Ventilation
•
A minimum clearance of 100 mm (3.94 in) is reserved around the
air inlet and outlet vents.
•
The installation site has a good ventilation system.
Temperature
•
Operating temperature: 0°C to 45°C (32°F to 113°F)
•
Storage temperature: –40°C to +70°C (–40°F to +158°F)
Humidity
5% RH to 95% RH, noncondensing
Cleanliness
Dust concentration ≤ 3 × 10
4
particles/m
3
(no visible dust on the
Flathead screwdriver
Phillips screwdriver
Needle-nose pliers
Wire stripper
ESD wrist strap
Diagnoal pliers
Heat gun
Network cable tester
Multimeter
Marker
Cage nut
(user supplied)
Grounding cable
M6 rack screw (provided
only with the
ICG2000D/2000D-EI, user
supplied for other models)
ICG2000D/2000D-EI
mounting brackets
M4 screw
Rubber feet
ICG2000D/2000D-EI/2000H
releasable cable tie
ICG2000D/2000D-EI/2000H
power cord
Console cable
ICG2000H/2000H-DC
mounting brackets
ICG2000H-DC
terminal block