12-1
12
Verifying the installation
Table 12-1 Post-installation checklist
Item
Requirements
Installation
location
•
No condensation is on the surface of the router or inside the router.
•
The router is clean and dust-free.
•
No packaging boxes, packaging bags, or other packaging materials are left
around the chassis.
•
The air inlet and outlet vents of the router are not blocked, free of obstructions.
Router
•
All components are installed correctly.
•
Each slot is installed with a module or filler panel.
•
Fan trays are installed correctly.
Cables
•
The router is grounded reliably with the provided grounding cable. Both ends of
the grounding cable are securely connected.
•
No switch or fuse is installed on the grounding cable.
•
The power cords are connected reliably and no short circuit has occurred in
power input and output.
•
Power cords, grounding cables and fiber cables are routed and bound separately.
•
The cables are bound neatly with cable ties at an even distance.
•
The cable labels are correct, clear, and affixed to the cable in the same direction.
Electricity safety
•
A circuit breaker is provided for each power input line.
•
Turn off the circuit breaker before you connect the power cord.
•
The power supply system can output enough voltage to ensure the normal
operation of the router.
•
Locate the emergency power-off switch in the room before installation so you can
quickly shut power off when an electrical accident occurs.
Summary of Contents for CR19000-16
Page 16: ...4 3 Figure 4 3 Mounting the router in a rack...
Page 25: ...6 8 Figure 6 6 Connecting an AC power cord using a releasable cable tie...
Page 36: ...9 3 Figure 9 3 Installing a filler panel in a fabric module slot...
Page 38: ...10 2 Figure 10 1 Installing a fan tray...