![H3C CR19000-16 Installation, Quick Start Download Page 5](http://html1.mh-extra.com/html/h3c/cr19000-16/cr19000-16_installation-quick-start_3060554005.webp)
1-1
1
Inspecting the router at delivery
When the router is delivered, inspect the items against the packing list. Make sure all items in the
list are delivered in good condition. Keep the items secure for future use.
IMPORTANT:
•
Install the router after finishing inspection. Do not inspect the router when installing it.
•
Keep the packaging materials secure for future moving or shipment.
•
If you find a fault with the router before powering it on, stop your operation, keeping the router as
it is, and take photos. Keep the original packaging materials and accessories secure.
Summary of Contents for CR19000-16
Page 16: ...4 3 Figure 4 3 Mounting the router in a rack...
Page 25: ...6 8 Figure 6 6 Connecting an AC power cord using a releasable cable tie...
Page 36: ...9 3 Figure 9 3 Installing a filler panel in a fabric module slot...
Page 38: ...10 2 Figure 10 1 Installing a fan tray...