9. Install the two handrail kick braces (13) between the intermediate support angle (5) and the handrail
posts (9) underneath the platform assembly using flange bolts (2) and flange nuts (3).
NOTE:
Hand tighten the handrail kick braces (13).
Figure 5-17
Installing the handrail kick braces for second platform
2
5/16 x 3/4 in. flange bolt (S-6606)
9
Platform handrail post (WBS-0019)
3
5/16 in. flange nut (S-3611)
13
Handrail kick brace (WBS-0025)
5
Intermediate support angle (WBS-0017)
62
PNEG-2077
TopDry – Platforms and Bin Stairs