3. Install the three handrail posts (9) to the outside support angle (6) and platform floor pan (7) in the
first platform section using the flange bolts (2) and flange nuts (3).
NOTE:
• Install the flange bolts (2) with the bolt head towards the inside of the platform.
• Hand tighten the flange bolts (2).
Figure 5-11
Installing the handrail posts for first platform section
2
5/16 x 3/4 in. flange bolt (S-6606)
6
Outside support angle (WBS-0015)
3
5/16 in. flange nut (S-3611)
7
Platform floor pan (WBS-0011)
5
Intermediate support angle (WBS-0017)
9
Platform handrail post (WBS-0019)
56
PNEG-2077
TopDry – Platforms and Bin Stairs